# Report: Development Cycle Wiring **Date:** 2026-09-22 **Source:** `designs/2026-09-22-development-cycle.md` ## Changes 1. **`plugins/spire/skills/igor/SKILL.md`** — Added `## Development Cycle` section between Delegation and Adepts. Covers: six stages with Igor as router, review decision tree (five outcomes), Athanor queuing rules (sequential, hold queue, TaskStop on invalidation), separation rule, exit heuristic, cycle-workpad relationship. ~250 words. 2. **`plugins/spire/agents/athanor.md`** — Added three bullet points to Operating rules: Igor holds the queue (one plan at a time), commit per plan step on branch, output goes to a fresh reviewer (no self-review). 3. **`plugins/spire/skills/implementation/SKILL.md`** — Added cycle framing note after intro: this skill governs Stage 5, Athanor receives a plan not a conversation, output goes to Stage 6 reviewer. 4. **`plugins/spire/skills/research/SKILL.md`** — Added cycle framing note: research is Stage 2 or a loop-back from Stage 6; output feeds Stage 3. 5. **`plugins/spire/skills/research-tree/SKILL.md`** — Added one-line framing note: structured form of Stage 2, output feeds Stage 3. 6. **`docs/workpad/designs/2026-09-14-plugin-design-spec.md`** — Fixed two instances of old Athanor metaphor ("put it in the oven") to match corrected metaphor (plans go into the Athanor).