Adept dispatches no longer pass a model alias over the pin. Igor checks
the stamped model id of plan, attack and phase-review outputs before
acting on them. Implementation work no longer goes to the Athanor as an
unplanned brief. The spawning reference says plainly that "verified"
means read from the schema, marks fork availability unverified, and
cites the 184/184 evidence for alias-over-pin. Minor consistency fixes:
trunk notes, re-check failure path, staging, fallout diffs, run-log
timing.
The implementation skill now states the lean loop: attack the plan
against the code before building, build phases in blocks with a cheap
gate between them, test and review once per phase, one fix pass, stop.
Harness mechanics, model observations and the run-log template move to
references with dated, sourced claims.
The Athanor becomes a build furnace pinned to claude-opus-5-5: one phase
per turn, no planning, no plan attack, no self-review. It no longer
preloads superpowers; those skills stay available as tools.