Commit Graph
5 Commits
Author SHA1 Message Date
Gabor Körber 7c1ed39474 🤖 Spire 0.2.2: drop superpowers default, build settings, pinned role agents
- Superpowers is no longer part of the cycle; it survives only in
  implementation/references/superpowers.md (older models, override table).
- implementation: plan altitude, staleness check in the attack, phase
  review records unplanned work (never auto-reverts).
- Igor: orienting is not deciding, light grilling trial in brainstorm,
  research briefs ask for findings, journal times from `date`.
- project/init: `## Build` settings section, gitignored project.local.md
  override.
- New pinned agents planner, attacker, reviewer (Opus 5.5).
- .codex/config.toml mirrors .claude/settings.json (spire + gitea).
2026-10-15 13:48:42 +02:00
g4borg b9ac765f5f 🤖 Pin Igor and adept to Opus 5.5 [1m] 2026-10-05 22:25:03 +02:00
g4borg f40cbf5a2a 🤖 Pin Athanor and Zathras to Opus 5.5 [1m]
Repins both agents to claude-opus-5-5[1m] per user decision (2026-10-05),
bumps Spire to 0.2.0, and resolves the open question in
spawning-claude-code.md about Athanor's context window suffix.
2026-10-05 22:21:45 +02:00
g4borg 5909221022 🤖 Apply lean Athanor review fixes
Adept dispatches no longer pass a model alias over the pin. Igor checks
the stamped model id of plan, attack and phase-review outputs before
acting on them. Implementation work no longer goes to the Athanor as an
unplanned brief. The spawning reference says plainly that "verified"
means read from the schema, marks fork availability unverified, and
cites the 184/184 evidence for alias-over-pin. Minor consistency fixes:
trunk notes, re-check failure path, staging, fallout diffs, run-log
timing.
2026-10-05 22:18:14 +02:00
g4borg e51520723c 🤖 Rewrite implementation skill and Athanor for lean building
The implementation skill now states the lean loop: attack the plan
against the code before building, build phases in blocks with a cheap
gate between them, test and review once per phase, one fix pass, stop.
Harness mechanics, model observations and the run-log template move to
references with dated, sourced claims.

The Athanor becomes a build furnace pinned to claude-opus-5-5: one phase
per turn, no planning, no plan attack, no self-review. It no longer
preloads superpowers; those skills stay available as tools.
2026-10-05 22:12:31 +02:00