🤖 Guidance pass C: rewrite steering sentences with counterweights

This commit is contained in:
2026-10-17 00:24:07 +02:00
parent 456862a96f
commit 46dbc861be
8 changed files with 42 additions and 34 deletions
@@ -31,14 +31,16 @@ Rules:
## Handoff note (one per block, written by the block's owner)
A few lines per block: findings, not narration. "none" is the normal answer for deviations and flags, and a real deviation or doubt is never left out.
```markdown
### Block <N.M> — <title>
- Model: <exact id>
- Start / end: <`date` output> / <`date` output>
- Done: <what changed, in a few lines>
- Deviations from plan: <what, and why> — or "none"
- Flagged for review: <anything the reviewer should look at, e.g. a semantic you were unsure of>
- Done: <what changed, in one or two lines>
- Deviations from plan: <what, and why, including size well over the plan's estimate> — or "none"
- Flagged for review: <a point you are unsure of, e.g. a semantic the plan left open> — or "none"
- Left for later: <work deferred to a later block or phase>
- Expected broken: <areas that do not build or pass yet, and which block fixes them>
- Commits: <hashes>
@@ -51,8 +53,8 @@ Rules:
- Gate: <command> — <result>
- Tests: <command> — <result> (fallout fixed in block <N.M>)
- Flags for the reviewer: every deviation and every "flagged for review" line above, one per bullet, with its block.
- Not run / untested: <anything the tests do not cover>
- Flags for the reviewer: the deviations and flags from the block notes above, one line each with its block — or "none" when the notes have none.
- Not run / untested: <behaviour the plan names that no test or gate ran> — or "none"
- Status: provisional until review, fix pass and re-check close.
```