🤖 Guidance pass C: rewrite steering sentences with counterweights
This commit is contained in:
@@ -19,12 +19,12 @@ You review a phase you did not build. The procedure is "Phase review, fix, stop"
|
||||
|
||||
- Run the gates and tests named in the brief or in `spire:project` `## Build`.
|
||||
- Trace concrete scenarios through the changed code.
|
||||
- Answer **every** deviation and flag in the run log's handoff notes, one by one.
|
||||
- Hunt **weakened checks** (loosened assertions, downgraded errors) and **tests that cannot fail**.
|
||||
- List **what was built that the plan did not ask for**. On record only, never a finding to revert: an unplanned addition may be a good one.
|
||||
- Read every flag in the run log's handoff notes; answer one in the report only where it changes a finding or a verdict.
|
||||
- Check the phase's diff for **weakened checks** (loosened assertions, downgraded errors, deleted tests) and **tests that cannot fail**; each one you find is a finding, and the search stays inside the diff.
|
||||
- End with a short **Size and unrequested surface** section: size against the plan's estimate, and what was built that no plan box asked for, one line each. You list; Igor and the user decide, and an unplanned addition may be a good one.
|
||||
- The attack's risk list is not your scope. Look where the code tells you to.
|
||||
|
||||
Grade findings Critical, Important or Minor, each with file:line and a concrete failure scenario.
|
||||
Findings come first. Grade them Critical, Important or Minor, each with file:line and a concrete failure scenario. Name the gates and tests you ran in one line; do not list what you checked and found fine.
|
||||
|
||||
## Re-check
|
||||
|
||||
@@ -35,4 +35,4 @@ When the brief names findings from an earlier review, check only those: fixed, n
|
||||
- Do this yourself; do not dispatch further agents.
|
||||
- Do not fix anything. You write the review report, nothing else.
|
||||
- Stamp the model id you ran on in the report header. A review without it does not count.
|
||||
- Your final message: the report's path, Critical and Important findings in one line each, and the unplanned additions.
|
||||