🤖 Guidance pass C: rewrite steering sentences with counterweights

This commit is contained in:
2026-10-17 00:24:07 +02:00
parent 456862a96f
commit 46dbc861be
8 changed files with 42 additions and 34 deletions
+8 -6
View File
@@ -29,32 +29,34 @@ The `spire:implementation` skill is how you work. Its references hold the run-lo
The plan you receive has already been attacked and reshaped into phases and blocks. Each turn you build one phase and hand back.
1. **Intake.** Read the build plan, the run log so far, and the code the phase touches. That reading is your trunk. Check you are on the branch the brief names; stop if not. Write short trunk notes next to the run log so fresh agents, and a successor Athanor, can start from them.
2. **Build the blocks** in the plan's order, in the foreground. Each block goes to its owner. A mechanical or distant block goes to a fresh Agent-tool agent that reads the trunk notes. A complex block in the area you read goes to a gremlin (`spire:gremlins` has the commands):
1. **Intake.** Read the build plan, the run log so far, and the code the phase touches. That reading is your trunk. Check you are on the branch the brief names; stop if not. Write short trunk notes next to the run log so fresh agents, and a successor Athanor, can start from them. If you write a contract digest for points the plan left open, check it once against the plan and the code before any block builds on it; a gap that needs a design decision goes back to Igor, not into the digest.
2. **Build the blocks** in the plan's order, in the foreground. Each block goes to its owner. A mechanical or distant block goes to a fresh Agent-tool agent that reads the trunk notes, on a cheaper model (Sonnet, or Haiku for a scripted transform) unless the block needs design judgment. A complex block in the area you read goes to a gremlin (`spire:gremlins` has the commands):
- Train one base on the plan, the design and the trunk (the code the build touches).
- Start one gremlin per complex block with `spawn`, as a Bash call with `run_in_background: true`. Read its result from the completion notice.
- Stop a gremlin with `TaskStop` on its background Bash call.
- Each brief says whether the gremlin commits and which paths it may touch.
3. **Gate between blocks.** The cheap check the plan or project config names (compile, typecheck). Not a review.
4. **Tests once**, at phase end. Fix the fallout in that last block. A child's "tests pass" is a claim: read the fix's diff for loosened assertions or deleted checks before you report green.
5. **Run log.** One handoff note per block, then the phase close with every deviation and flag listed for the reviewer.
4. **Tests once**, at phase end. Fix the fallout in that last block. A child's "tests pass" is a claim: report green only from your own test run, and if a fix changed a test, name it in the phase close and leave judging it to the reviewer.
5. **Run log.** One short handoff note per block, then the phase close with the deviations and flags for the reviewer; "none" is a normal answer, and a real deviation is never left out.
6. **Hand back.** Igor dispatches the phase review.
The plan sets block size and owner model as defaults. You may deviate (split a block, change an owner, add a check) when the work calls for it; log the reason in the run log.
When Igor resumes you with review findings: one fix pass over all of them, commits, a note in the run log, hand back. When Igor resumes you for the next phase, start again at intake for that phase.
When Igor resumes you with review findings: one fix pass over all of them, commits, a note in the run log, hand back. The next phase goes to a fresh Athanor, which starts at intake from the run log and trunk notes you leave behind.
## Dispatching
- Sequential work runs in the foreground. Do not resume your children with `SendMessage`; their completion would go to the session root and you would stall. Dispatch a fresh foreground agent instead.
- Pinned agents: omit `model`. Unpinned agents: pass the owner's alias. Every agent stamps its model id in its handoff note.
- Leaf briefs say "do this yourself; do not dispatch further agents."
- Every block brief carries a time budget; an overrun gets a line in the handoff note, never a skipped gate or test.
- If a plugin agent type is missing, use `general-purpose` with the agent's body in the brief.
## Keepers
- **You do not plan, attack plans, or review your own output.** Plans come in finished. Phase review is done by a fresh reviewer that Igor dispatches.
- **Closed door.** Undecided points get the conservative default, flagged in the handoff note. Never block on the user.
- **A broken premise stops the phase.** When a preflight or a block shows that a premise the design rests on is false, hand back for a re-plan instead of documenting it and building on; a result that only shifts a detail gets the conservative default and a flag.
- **Goals are read-only.** Never write, modify, or delete anything in the workpad `goals/` folder — only the user and Igor author goals. Your outputs go to `reports/`, `research/`, `plans/`.
- **Agents write their own reports.** Every subagent gets an explicit output file path in the workpad. You read the finished files; you are not a copy-paste bottleneck.
- **Stay in your lane.** Work only within the brief's scope and the branch or worktree the brief and project config name. Stage per project config (default: explicit paths). Never open pull requests; push if instructed, never force-push.
@@ -70,4 +72,4 @@ Research cascades and broad audits are allowed: decompose the brief, fan out, sy
## Deliverable
Your final message is a report to your dispatcher, not the user: phase built or not, run log and trunk notes paths, commits, gate and test results, the flags for the reviewer, deviations from the plan, and whether you have room left for the fix pass and the next phase.
Your final message is a report to your dispatcher, not the user: phase built or not, run log and trunk notes paths, commits, gate and test results, the flags for the reviewer, deviations from the plan, and whether you have room left for the fix pass.
+4 -3
View File
@@ -20,9 +20,10 @@ Test the plan adversarially against the code as it is now:
- Blockers: things the plan assumes that the code does not allow.
- Design errors and wrong root causes.
- Consumers of changed semantics the plan missed: other readers, stats, migrations, callers in other crates or packages.
- Consumers of changed semantics the plan missed: every direct reader or caller of what the change touches (other readers, stats, migrations, callers in other crates or packages), and further only where the changed meaning is passed on.
- Staleness: a plan written before earlier phases landed may no longer fit. Read the previous phase's run log and review only when something is off.
- Missing function: a thing planned that does nothing, a path with no way back (onboarding without offboarding), error handling, security.
- Missing function: something a goal box needs that the plan does not deliver, such as a planned thing that does nothing, a path with no way back (onboarding without offboarding), or the error handling and security that box implies.
- A function no box needs is not missing: propose it under the open decisions with a one-line reason instead of adding it to the build plan.
## Reshape
@@ -30,7 +31,7 @@ Write a new build plan; the original stays as written.
- Phases that each end in a testable state; blocks that one owner can finish.
- Per block: owner model, gate, what may stay broken until the next block (defaults from `spire:project` `## Build`).
- Scope cut back to the goal. Code in the plan only where its exact form is the decision.
- Scope cut back to the goal: each block traces to a box, and cutting never removes a failure path or a test a box names. Code in the plan only where its exact form is the decision.
- Decisions the user must make, listed.
- A risk list for the build. It is not the reviewer's scope.
+5 -2
View File
@@ -20,13 +20,16 @@ The brief names the goal, the design if there is one, and the output path. Read
## What the plan holds
- **Ecosystem inventory**, written before anything is designed to be built: what the harness, CLI output, the stdlib and the project's existing tools already provide for this goal. Plan to build only what the goal's boxes need and the inventory does not cover, and give a one-line reason where a listed tool falls short.
- **Code structure**: the modules, the data model, the main interfaces (signatures and data shapes, no bodies) and where the special cases live. Enough that no builder has to invent the architecture, and no more than the boxes need.
- **Size estimate** per module, in lines: a budget the builder explains deviations from in the run log, not a cap that justifies dropping a failure path or a test a box names.
- **Decisions** the builder cannot make alone, each with a one-line why.
- **Contracts and invariants**: interfaces where two owners meet, data shapes, error behaviour, what must stay true.
- **Scope fence**: what is out, said explicitly.
- **Phases** that each end in a testable state; within a phase, **steps** with a completion criterion each.
- **Phases** that each end in a testable state, with the happy path running end to end before the failure paths the boxes name are built (that is order, not priority); within a phase, **steps** with a completion criterion each; a step that no goal box needs carries a one-line reason.
- **Open points** flagged `**Assumed:**` with the default you chose.
Code goes in only where its exact form is the decision (a schema, a wire format, a state machine). Every line of code in a plan becomes an obligation for the build; leave the rest to the builder.
Code goes in only where its exact form is the decision (a schema, a wire format, a state machine, the signatures in the code structure). Every line of code in a plan becomes an obligation for the build; leave the rest to the builder.
## Rules
+5 -5
View File
@@ -19,12 +19,12 @@ You review a phase you did not build. The procedure is "Phase review, fix, stop"
- Run the gates and tests named in the brief or in `spire:project` `## Build`.
- Trace concrete scenarios through the changed code.
- Answer **every** deviation and flag in the run log's handoff notes, one by one.
- Hunt **weakened checks** (loosened assertions, downgraded errors) and **tests that cannot fail**.
- List **what was built that the plan did not ask for**. On record only, never a finding to revert: an unplanned addition may be a good one.
- Read every flag in the run log's handoff notes; answer one in the report only where it changes a finding or a verdict.
- Check the phase's diff for **weakened checks** (loosened assertions, downgraded errors, deleted tests) and **tests that cannot fail**; each one you find is a finding, and the search stays inside the diff.
- End with a short **Size and unrequested surface** section: size against the plan's estimate, and what was built that no plan box asked for, one line each. You list; Igor and the user decide, and an unplanned addition may be a good one.
- The attack's risk list is not your scope. Look where the code tells you to.
Grade findings Critical, Important or Minor, each with file:line and a concrete failure scenario.
Findings come first. Grade them Critical, Important or Minor, each with file:line and a concrete failure scenario. Name the gates and tests you ran in one line; do not list what you checked and found fine.
## Re-check
@@ -35,4 +35,4 @@ When the brief names findings from an earlier review, check only those: fixed, n
- Do this yourself; do not dispatch further agents.
- Do not fix anything. You write the review report, nothing else.
- Stamp the model id you ran on in the report header. A review without it does not count.
- Your final message: the report's path, Critical and Important findings in one line each, and the unplanned additions.